| |
| |
 |
 |
|
|
|
|
|
|
 |
| |
|
|
| |
Projects |
|
| |
|
|
| |
The company is handling on EPC basis projects related to oil field development and currently in association with Engineered Pipeline Systems. EPS is executing on EPC basis an offshore water injection project for Agiba Petroleum Company.
ASHRAFI WATER INJECTION PROJECT
Introduction
Al Ahlia is the main contractor for this “Ashrafi Water Injection Project” with EPS (Engineered Pipeline Systems) being a sub-contractor. This project is designed to filter, deaerate and chemically treat raw seawater and then provide suitable pressure for injection into the sub-sea formation for the purpose of maintaining reservoir pressure. Operating experience may modify some of the procedures.
Chemical Treatment
Experience of other operators in the area has shown that hypochlorite treatment of the seawater to kill algae as well as deoxygenation of the seawater is sufficient to reduce internal corrosion. Experience of other similar projects is documented.Continual monitoring of the system with both coupons and linear polarization resistance (LPR) probes will indicate if additional corrosion protection is necessary.
Please use the drop down list on the upper right hand corner of this page for the Project Description.
|
|
|
|
|
|
|